| What exists today | The industrial precinct is complete and operating: ship repair and marine services, workshops, warehouses and showrooms, alongside the Drydocks World yard. Last verified 10 September 2026 | The marina operates, run by P&O Marinas, alongside the Hamdan bin Mohammed Cruise Terminal, which handles the port's cruise traffic. Last verified 10 September 2026 | The road bridges from Deira are open and the Blue Flag beach is in use. Two or three resort hotels and Souk Al Marfa trade; that is the extent of what operates today. Last verified 28 August 2026 |
|---|
| The OAC18 view | Central water frontage at an early price, with a working shipyard for a neighbour. | Central waterfront at an early-stage price, with an operating marina already in place. | Buy Dubai Islands for beachfront at a fair entry price. Buy the developer, not the master plan. |
|---|