Under constructionSelect GroupSix Senses Residences Dubai Marina
Price on application
- Handover
- 2029
- Payment plan
- 40/60
2 bed – 5 bed · Apartments & penthouses


+971 50 436 5043Mon–Sat 9:00–18:00 GST · International callers: outside these hours by appointment.

Render — not a photograph
Community · Downtown & Urban · Masterplan by Emaar Properties
EstablishedThe city's original high-rise waterfront: liquid, rental-led, and more variable building by building than any other district.
Dubai Marina is a two-kilometre canal lined with residential towers, completed in phases from 2003. It has the tram, the metro at both ends, the beach at JBR next door, and the deepest short-let market in the city.
Stock ranges from the early Emaar towers on the original six-tower site to newer Vida and branded buildings. Age and management drive price per square foot; a marina-facing unit on a high floor in a well-run tower is a different asset from a road-facing unit two towers along.
It suits investors who want yield and liquidity, and professionals who want to walk to the tram and to dinner. It is not a family community.
The same layout two towers along can be a full point of yield apart.
Phases
Handed over · 2003–2008
The six towers on the first stretch of canal and the promenade around them.
Handed over · 2006–2018
Dozens of towers from many developers on plots sold by Emaar; quality ranges widely.
Under construction · 2026–2028 (developer targets)
A few last sites, mostly branded or serviced towers.

2022 · AED 1,4502026 · AED 2,050
Advertised vs realised
What exists today
The Marina is finished as a district: two kilometres of canal-side promenade with restaurants, Dubai Marina Mall, a supermarket in almost every block and JBR beach next door.
The tram runs the length of the district and connects to the metro at DMCC and Sobha Realty stations at either end.
No school inside the Marina; Emirates International in Meadows and the Al Sufouh schools are around fifteen minutes.
A few plots are still being built, and the internal roads congest in the evening and at weekends. Building age now ranges from new to twenty years, which matters more than the address.
Last verified
Handed over · 2003–2008
The six towers on the first stretch of canal and the promenade around them.
Handed over · 2006–2018
Dozens of towers from many developers on plots sold by Emaar; quality ranges widely.
Under construction · 2026–2028 (developer targets)
A few last sites, mostly branded or serviced towers.
The Marina Walk and JBR beach; the water is a canal, not the sea, unless you are on the western edge.
Marina Mall and the walk; more restaurants per square kilometre than anywhere else in the city.
None inside; Emirates International in Meadows is fifteen minutes.
Clinics on the walk; Al Zahra in Al Barsha is fifteen minutes.
The tram runs the length of the Marina and links to the metro at both ends; Media City is eight minutes, DIFC twenty-five.
The tram and metro genuinely work here. Driving in and out at 6pm does not.
Advertised vs realised
The Marina Walk and JBR beach; the water is a canal, not the sea, unless you are on the western edge.
Marina Mall and the walk; more restaurants per square kilometre than anywhere else in the city.
None inside; Emirates International in Meadows is fifteen minutes.
Clinics on the walk; Al Zahra in Al Barsha is fifteen minutes.
The tram runs the length of the Marina and links to the metro at both ends; Media City is eight minutes, DIFC twenty-five.
The tram and metro genuinely work here. Driving in and out at 6pm does not.
Projects in this community
2 projects we cover in Dubai Marina, grouped by the year they are due to hand over — so you can see where completions cluster before you pick one.
Under constructionSelect GroupPrice on application
2 bed – 5 bed · Apartments & penthouses
New launchLIV DevelopersNext step
What is for sale in Dubai Marina changes week to week, project by project and building by building. Tell us the budget and the bedrooms you have in mind and we will send what is genuinely open, at today's prices, with our view on which to look at first.
An advisor checks it before sending and replies within one business day.Use Availability in the bar below — an advisor checks it before sending and replies within one business day.
Buy the Marina for yield and liquidity. Choose the tower before the view, and read the service charge before either.

Supply is dominated by the existing stock of several tens of thousands of units and a constant flow of resale and short-let listings; new towers add little at the margin. Advertised gross yields of 6.4% have realised nearer 5.0% once charges, voids and leasing fees are counted, and the spread between well- and poorly-managed towers is a full point.
We recommend it for investors who accept higher tenant turnover in exchange for the income and the exit. We would not put a family here, and we would not buy a road-facing unit at a marina-facing price.
Compare with nearby communities

Six minutes away with a private beach and new-build stock, at a higher price and lower yield.

Cheaper entry and higher headline yield inland, with the widest gap to realised yield in the city.


Twenty minutes on Dubai Marina specifically — which phases, which developers, and where the handover and resale risk actually sits.